Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2020 | PLUMBING - FINAL | Approved | Ap | |
| 02/19/2020 | PLUMBING - FINAL | Not ready for Inspection | No supply water to sink, lockout tag out on electrical panel missing, no smoke detectors, paint ABS on roof. STOPPED INSPECTION. | |
| 01/21/2020 | PLUMBING - FINAL | Denied | No access. Call contact arrived 12:15. | |
| 06/07/2019 | PLUMBING - FINAL | Partial Approval | 1- Shall provide smoke detectors at hallway and all bedrooms. 2- Shall provide water hammer arrestors for the dishwasher and clothes washer. 3- Shall provide a trap guard on floor drain in bathroom 4- Shall provide trim plates on all electric outlets. 5- complete kitchen sink installation. |