Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2019 | FIRE - FINAL | Approved | ||
| 06/20/2019 | FIRE - FINAL | Partial Approval | Ok to obtain TCO. Items to be completed prior to admitting patients. 1. Have back flow valves to sprinkler system monitored by alarm panel 2. Provide Knox box and FDC knox plug. |
|
| 06/13/2019 | FIRE - FINAL | Partial Approval | 1. West stair well 2 exit signs inoperable 2. Provide fire extinguisher at each stairway exit, service or provide new extinguishers on the 2nd floor. 3. Provide Knox key box and FDC plug 4. Install Riser Room exterior and FACP interior signs Verify if double back flow needs to be secured or monitored |