Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2018 | PLUMBING - ROUGH, SOIL | Approved | WATER TEST OK | |
| 06/22/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | PLUMBING MUST HAVE WATER IN SYSTEM AT TIME OF INSPECTION ROUGH SOIL PLUMBING TRENCH MUST BE CLEAR AND OR FREE OF DIRT AND DEBRIS FOR INSPECTION |
|
| 06/15/2018 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- ABS SCH. 40 MATERIAL FOR P-2 FIXTURE IS NOT APPROVED MATERIALS FOR EXTERIOR LOCATIONS. * |