Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 09/10/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
|
| 08/20/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
footings OK to pour on retention pond wall. I asked the superintendent to please get with the architect as the detail is inaccurate with the grade or elevation as the majority of one side of the wall is below grade it may require weatherproofing, gravel, perforated pipes, etc, which is not on the detail. This will need to be addressed before backfilling this wall. |
| 07/23/2019 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Partial Approval |
Footing and Steel |