Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2019 | ELECTRIC - FINAL | Approved | ||
| 02/15/2019 | ELECTRIC - FINAL | Correction Required | 1-Separate neutrals and grounds at sub-panel. 2-Bond sub-panel. 3-Rome’s exposed at eaves; will be covered with T111 for Final. |