Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2018 | PLUMBING - FINAL | Approved | ||
| 07/23/2018 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE ACCESSIBLE SIGNAGE FOR THE MENS AND WOMENS RESTROOMS WITH BRAILE AND LOCATE AT THE LATCH SIDE OF THE DOOR. 2- SHALL PROVIDE TRU BRO ADA WRAP PROTECTION FOR THE LAVATORY P-TRAP AND WATER SUPPLIES. 3- SHALL LOCATE THE REFLECTION OF THE MIRRORS 40- INCHES ABOVE FINISH FLOOR. 4- SHALL INSTALL ALL GRAB BARS PER ANSI A117-A EDITION * |
|
| 04/13/2018 | PLUMBING - FINAL | Prior to Final Inspectn | WATER CHLORINATION REPORT REQUIRED |