Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/28/2018 |
PLUMBING - INTERMEDIATE |
|
Approved |
|
| 01/25/2018 |
PLUMBING - INTERMEDIATE |
|
Denied |
seal enetration at 2nd floor tubs |
| 01/24/2018 |
PLUMBING - INTERMEDIATE |
|
Denied |
1 provide max 1 1/4" nosing on stair treads 2 seal all penetrations 3 seat 2nd floor tub penetrations 4 install insulation shield on w/h b vent in attic |
| 01/18/2018 |
PLUMBING - INTERMEDIATE |
|
Denied |
1 shim bearing headers 2 provide max 1 1/4" nosing on stair treads and landings 3 nail 2nd floor shear wall sole plates per plans 4 install tbraces on gable end braces over6' in length 5 provide access to ufer clamp 6 complete electic to low volt panel 7 protect electic conductors within 6' of attic access 8 complete electric in masterbath lid 9 seal 2nd floor penetrations at tubs 10 support dwv at mid story 11 provide gas test o min 10 psi 12 install insulation shield on w/h b vent 13 seal all penetrations in lath |
| 01/17/2018 |
PLUMBING - INTERMEDIATE |
|
Cancelled |
|
| 01/16/2018 |
PLUMBING - INTERMEDIATE |
|
Denied |
WORK INCOMPLETE, NO PLANS ON SITE |