Inspection History Details
Inspection Status: Approved
Inspection History: STEM WALL/RETAINING WALL
Permit Number - T17CM08309
Inspection Description - STEM WALL/RETAINING WALL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/10/2018 | STEM WALL/RETAINING WALL | Approved | Garden wall out front, 3'6 high, #5 t&B and #5 verts at 43"OC. | |
06/20/2018 | STEM WALL/RETAINING WALL | Partial Approval | NORTH WALL OF TUBE LAST COURSE | |
06/14/2018 | STEM WALL/RETAINING WALL | Partial Approval | SOUTH WALL OF TUBE COMPLETE WITH BOLTS AND BEAM POCKETS, NORTH WALL CUTS MADE AND INSTALLED, NOT APPROVED FOR GROUT AT THIS TIME. | |
06/13/2018 | STEM WALL/RETAINING WALL | Partial Approval | SOUTH SIDE OF TUNNEL HAS TOP COURSE COMPLETE WITH BOLTS AND BEAM SUPPORT BRACKETS | |
06/11/2018 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* 1- 2ND LIFT NORTH EQUIPMENT ROOM IS OKAY FOR GROUT. 2- TOP OUT ENTRANCE AND EXIT OF TUNNEL ONLY IS OKAY TO CAP, BOND BEAM PROVIDED. |
|
06/04/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | ||
05/29/2018 | STEM WALL/RETAINING WALL | Partial Approval | IVRS - Inspection :* 1- STEEL REINFORCEMENT IN CMV WALLS PROVIDED. 2- LADDER WIRE PROVIDED. 3- OKAY TO GROUT THE THIRD LIFT NORTH AND SOUTH TUNNEL WALLS AND THE ENTRANCE AND EXITS OF THE TUNNEL ONLY. |
|
05/25/2018 | STEM WALL/RETAINING WALL | Not ready for Inspection | ||
05/23/2018 | STEM WALL/RETAINING WALL | Partial Approval | 2nd lift north tullel ok 1st lift east and west tunnel ok |
|
04/23/2018 | STEM WALL/RETAINING WALL | Denied | WALL POURED BEFORE INSPECTIONS |