Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/01/2018 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 02/16/2018 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A DIRECTIONAL FITIING FOR THE TWO WAY CLEAN OUT. 2- SHASLL PROVIDE A MINIMUM OF 12 INCHES OF COVER ON THE ABS BLDG. SEWER OR PROVIDE CAST IRON MATERIAL UNTIL YOU CAN ACHEIVE 12 INCHES OF COVER. 3- SHALL ROUGH IN THE UNDERGROUND PLUMBING PER THE HORIZONTAL VENTING REQUIREMENTS FOR A BATHROOM GROUP PER CHAPTER 9 IN THE 2012 IPC. 4- R TEST THE DWV SYSTEM. * |