Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2017 | PLUMBING - GAS PRESSURE TEST | Approved | CLEAR GAS METER | |
| 10/23/2017 | PLUMBING - GAS PRESSURE TEST | Denied | 1- SHALL PROVIDE THE REQUIRED TEST GUAGE 15 LBS MAX WITH 1/10 INCREMENTS. 2- SHALL SECURE THE 1/2 INCH GAS DROP TO THE FURNACE. 3- SHALL BOND THE GAS LINE. 4- SHALL PROVIDE FRESH BATTERIES FOR THE CARBON MONOXCIDE DETECTOR. 5- SHALL SEAL THE GAS LINE PENETRATION THRU THE MASONARY WALL. |