Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2017 | PLUMBING - FINAL | Approved | APPROVED | |
| 10/20/2017 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE THE APPROVED PLAN ON SITE AT THE TIME OF INSPECTION. 2- GAS PRESSURE TEST IA LOOSING PRESSURE, CHECH SYSTEM FOR LEAKS. 3- SHALL PROVIDE A FIXED IN OPEN POSITION KIT FOR THE FIREPLACE DAMPER TO REMAIN ALWAYS OPEN DUE TO THE GAS LOG LIGHTER. * |