Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2018 | BUILDING PRE-SLAB | Approved | ||
| 02/28/2018 | BUILDING PRE-SLAB | Partial Approval | HOLDDOWNS NOT IN CORRECT LOCATIONS PER APPROVED PLAN. RELOCATRE AND RECALL | |
| 02/16/2018 | BUILDING PRE-SLAB | Denied | NEEDS TO DRY OUT. SOME REBAR COLLAPSED TO THE DIRT NO PLANS ON SITE CLEAN OUT FOOTINGS |
|
| 02/08/2018 | BUILDING PRE-SLAB | Denied | 1 clean out bottom of footings 2 install rebar at hold downs 3 wrap all plumbing |