Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2018 | PLUMBING - FINAL | Approved | ||
| 02/27/2018 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/26/2018 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 * |
|
| 02/26/2018 | PLUMBING - FINAL | Denied | Call for and get approved all required inspections prior to calling for finals. Provide access to attic; gas and mech intermediates have not been approved. Provide all required paperwork. Seal threads of AAV and cleanout plugs. Solvent cement fip adaptors. trimout side cleanouts at grade. Seal wayter heater "pan". Door bell hanging, SD chirping. |
|
| 02/21/2018 | PLUMBING - FINAL | Denied | 1 label gfci's 2 gfci in kitchen not resetting 3 refridgerator shll not be on gfci circuit 4 ground metal box at disposal swithch 5label panel non metallic plumbing |