Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2018 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 12/20/2017 | BUILDING - FINAL | Denied | 1. INSTALL BOND BUSHINGS ON ALL CONDUITS ENTERING BOXES. 2. PROVIDE LADDER FOR ROOF TOP INSPECTION (NEED TO VERIFY BONDING OF RACK SYSTEM TO CONDUIT) 3. RE-CALL BOTH BUILDING AND ELECTRICAL FINALS |