Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/27/2018 |
ENGINEERING - FINAL |
|
Approved |
|
| 12/19/2018 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Gary with kbp 272 - 3663, complete the work shown on the DP as noted on December 18th. ok for tco |
| 12/18/2018 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Complete the work shown on dp1 7 - 0225 . Complete accessible parking spaces and walkways, striping. Install rip rap and accessible signage. |
| 12/12/2018 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
I spoke with Gary the GC about a provision for the deleted trash and closure and completing the Landscaping grading and striping required to final the DP |