Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2018 | ENGINEERING - FINAL | Approved | ||
| 06/18/2018 | ENGINEERING - FINAL | Partial Approval | PREVIOUS COMMENTS HAVE BEEN ADDRESSED, THIS INSPECTION WILL BE RESCHEDULED ONCE THE LOT IS CLEARED OF CONSTRUCTION TRASH AND DEBRIS. | |
| 06/12/2018 | ENGINEERING - FINAL | Partial Approval | THIS SITE IS OK FOR THE TCO WITH THE FOLLOWING ISSUES TO BE ADDRESSED. 1) THE NORTHERN ADA PARKING SPACES ON THE WEST SIDE OF THE BUILDING EXCEEDS THE MAXIMUM SLOPE VALUE IN THE LAST 2 FEET OF THE SPACE. THE CONTRACTOR HAS BEEN ADVISED TO MAKE IT COMPLIANT BEFORE REQUESTING A FINAL INSPECTION FOR THIS SITE. |