Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2018 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 12/19/2017 | PLUMBING - GAS PRESSURE TEST | Cancelled | ||
| 12/14/2017 | PLUMBING - GAS PRESSURE TEST | Denied | COMPLY WITH PREVIOUS STOPPED INSPECTION 1ST FLOOR NEXT DENIAL MAY RESULT IN A REFEE |
|
| 12/12/2017 | PLUMBING - GAS PRESSURE TEST | Denied | PROVIDE PLANS SECURE AB'S THROUGHOUT FIRESTOP TUB SHOE TERMINATE 220 RANGE BLOCK REGISTER BOOTS 3-SIDES SECURE CLOSET FLANGES STOPPED INSPECTION 1ST FLOOR |
|
| 12/08/2017 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | CANCELED |