Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2017 | PLUMBING - ROUGH, SOIL | Approved | ||
| 10/04/2017 | PLUMBING - ROUGH, SOIL | Denied | KITCHEN SINK IS BACK PITCHED PIPES NOT WRAPED FOR PRE SLAB DOUBLE SINK AND TOILET ARE REVERSED HCS CONNECT AREA IS TO WET |
|
| 09/29/2017 | PLUMBING - ROUGH, SOIL | Denied | Provide proper use of drainage fittings; combo on horizontal, santee on vertical connection from showers. * |
|
| 09/28/2017 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* |