Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2018 | FRAMING | Approved | ||
| 12/21/2017 | FRAMING | Denied | COMPLY WITH PRERVIOUS PROVIDE 3 WAY SWITCH PER PLAN SECURE ROMEX THROUGHOUT GROUND METAL BOXES PROVIDE H2-5 CLIPS PER PLAN RAFTER TO WALL CONNECTIONS EXPOSE ALL WIRING FOR INSPECTION 220 AT LAUNDRY NOT ON PLAN |
|
| 12/18/2017 | FRAMING | Denied | COMPLY WITH PREVIOUS NEXT DENIAL WILL RESULT IN A REFEE |
|
| 11/22/2017 | FRAMING | Denied | PLAN CALLS FOR 2X10 RAFTERS 2X8'S INSTALLED MISSING OUTLETS PER PLAN EXPOSE FOOTERS TO VERIFY DEPTH PER PLAN EXPOSE RAFTER TO WALL CONNECTIONS PLAN CALLS FOR 2X6 WALL FRAMING 2X4 INSTALLED EXPOSE DUCT WORK PER PLAN WATER HEATER B-VENT NOT TO CODE COMPLY WITH PREVIOUS |
|
| 11/21/2017 | FRAMING | Denied | PROVIDE ACCESS PROVIDE APPROVED PLANS EXPOSE ALL WORK TO PLAN FOR INSPECTION OR PROVIDE LETTERHEAD FROM LICENSED GENERAL CONTRACTOR STATING ALL WORK TO PLAN DONE TO CODE FOR SAFETY |