Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2018 | PLUMBING - INTERMEDIATE | Approved | ||
| 03/13/2018 | PLUMBING - INTERMEDIATE | Denied | NAIL PROTECT PLUMBING AT LAUNDRY DRAIN DAMAGED FIRE BLOCK THROUGHOUT TOO MUCH MOISTURE THROUGHOUT FIRE BLOCK AT NICHE FIRE SEAL ALL TOP PLATE PENETRATIONS BLOCK REGISTER BOOTS 3-SIDES MOISTURE AT HRD DUCT INSULATIN UPSTAIRS INSTALL PAN UPSTAIRS SHOWER STAIR TREAD TO BE 6" MINIMUM BOND GAS LINE |