Inspection History Details
Inspection Status: Partial Approval
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2018 | FRAMING | Partial Approval | Shower pan leak test ok. | |
| 10/09/2018 | FRAMING | Not ready for Inspection | Post address prior to next inspection | |
| 10/05/2018 | FRAMING | Not ready for Inspection | ||
| 03/28/2018 | FRAMING | Partial Approval | ||
| 03/27/2018 | FRAMING | Partial Approval | Blocking, Regester Framing, and Top Plate Penitrations Sealed per Corrections of 3/13/18 Asked to Install Straps at All Cut Bottom Sills | |
| 03/19/2018 | FRAMING | Partial Approval | COMPLY WITH PREVIOUS | |
| 03/13/2018 | FRAMING | Denied | NAIL PROTECT PLUMBING AT LAUNDRY DRAIN DAMAGED FIRE BLOCK THROUGHOUT TOO MUCH MOISTURE THROUGHOUT FIRE BLOCK AT NICHE FIRE SEAL ALL TOP PLATE PENETRATIONS BLOCK REGISTER BOOTS 3-SIDES MOISTURE AT HRD DUCT INSULATIN UPSTAIRS INSTALL PAN UPSTAIRS SHOWER STAIR TREAD TO BE 6" MINIMUM BOND GAS LINE |