Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2018 | ENGINEERING - FINAL | Approved | ||
| 09/07/2017 | ENGINEERING - FINAL | Partial Approval | THIS SITE HAS NOT CHANGED IN THE PAST FEW MONTHS SINCE THE SHELL PERMIT WAS APPROVED, FOLLING ARE THE COMMENTS FROM THE PREVIOUS INSPECTION OF THE SHELL PERMIT. "EXISTING NON-CONFORMING SITE DOES NOT MEET ADA STANDARDS. NO CHANGES PROPOSED OR PERFORMED EXTERIOR TO THE BUILDING. FUTURE MODIFICATIONS TO THE ACCESSIBLE ROUTE WILL REQUIRE FULL COMPLIANCE TO ADA." NON COMPLIAT ITEMS AS FOLLOWS: 1) PARKING SPACE AND ACCESS AISLE ARE CURRENTLY OVER 2% 2) SIDEWALK FROM PARKING SPACES TO BUILDING 205% TO 4.5 % AT VARIOUS LOCATIONS. THESE WILL NEED TO BE ADDRESSED AND REDONE SO THAT THEY ARE 2% OR LESS AT ALL LOCATIONS. |