Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/14/2018 | FIRE SPKLR - FINAL | Approved | alarm approved per CB | |
| 05/15/2018 | FIRE SPKLR - FINAL | Partial Approval | 1) Missing head in riser room. 2) Sprink system needs to be elec supervised. 3) Annual sprink inspection required. Provide report. 4) 5yr internal check valve inspection. Provide report. |