Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2017 | MECHANICAL - INTERMEDIATE | Approved | ||
| 11/21/2017 | MECHANICAL - INTERMEDIATE | Denied | boxs framed 3 sides, insulate branch fittings, PVC over stressed at 90 | |
| 11/16/2017 | MECHANICAL - INTERMEDIATE | Not ready for Inspection | branch fittings to be insulated to minimum R-8 duct drops to be insulated to minimum R-8 all PVC joints and fittings to be primed prior to glue, primer is to be purple in color |