Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2018 | BUILDING - FINAL | Approved | APPROVED | |
| 08/01/2018 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL EXTEND THE WATER HEATER T & P DRAIN AND TERMINATE IT INTO THE PAN. 2- SHALL PROVIDE A 90 DEGREE ELBOW FOR THE CONDENSATE TERMINATION AT EXTERIOR WALL. 3- SHALL PAINT THE ABS VENTS THRU ROOF. 4- SHALL PROVIDE ALL REQUIRED CERTIFICATIONS. * |