Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/08/2018 |
PLUMBING - INTERMEDIATE |
|
Approved |
|
| 06/07/2018 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
cancelled |
| 06/01/2018 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
DWV not on test |
| 05/21/2018 |
PLUMBING - INTERMEDIATE |
|
Denied |
1 12 GA AND 14 GA CINDUCTORS SHALL NOT BE TIED TOGETHER 2 INSTALL COVER PLATE AT FAN 3 T&P LINE TO TERMINATE TO OUTSIDE 4 PROVIDE POWER SUPPLY TO WATER HEATER |
| 05/03/2018 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
PEX NEEDS TO BE FILLED WITH WATER TO TEST FOR LEAKS. IF WATER HEATER IS INSTALLED IT NEEDS TO BE INCLUDED IN DRAWINGS. NEED NAIL PLATES THROUGHOUT AT PEX PIPING. |
| 01/16/2018 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
NEED TO WRAP PLUMBING FOR PRE SLAB |