Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2017 | PLUMBING - FINAL | Approved | ||
| 08/24/2017 | PLUMBING - FINAL | Denied | 1- SHALL SEAL THE GS LINE PENETRATION FOR RANGE. 2- SHALL BOND THE GAS LINE WITH #6 COPPER CONDUCTOR. 3- SHALL MOVE THE INDOOR WATER HEATER FLU VENT OVER TO PROVIDE A MINIMUM OF 1 INCH ANULAR SPACE AROUND THE SHEET ROCK CEILING. 4- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR AND LOCATE IT IN HALLWAY |