Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2017 | PLUMBING - ROUGH, SOIL | Approved | APPROVED | |
| 10/24/2017 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1- DWV WATER TEST PROVIDED. 2- BUILDING SEWER HAS BEEN RELOCATED. 3- SHALL CALL FOR INSPECTION WHEN THE FINAL CONNECTION TO THE EXISTING BLDG. SEWER HAS BEEN MADE. 4- NOTE; THE EXISTING GAS LINE CAN NOT BE LOCATED UNDER THE NEW STRUCTURE. |
|
| 10/11/2017 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL RELOCATE THE BLDG. DRAIN FROM UNDERNEATH THE FOOTING AND LOCATE THE BOTTOM OF THE PLUMBING TRENCH A MINIMUM OF 45 DEGREES FROM THE BOTTOM OF THE FOOTING. REFERENCE 307.5 2012 IPC. 2- VITRIOUS CLAY PIPE IS NOT APPROVED MATERIAL UNDER THE FOOTPRINT OF THE STRUCTURE. SHALL PROVIDE APPROVED MATERIAL. REFERENCE TABLE 702.2 20212 IPC. THE BLDG. WATER SUPPLY APPEARS TO BE UNDERSIZED. SHALL PROVIDE A REVISED WATER CALULATION FOR THE ADDED FIXTURE UNIT LOAD. * |