Permit: T17CM06338

Parcel: 11810134D

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T17CM06338

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
09/01/2017 ENGINEERING - FINAL Approved
08/21/2017 ENGINEERING - FINAL Not ready for Inspection THE CREW IS STILL WORKING ON THE INSTALLATION OF THE PIPE, THEY WILL LET ME KNOW WHEN THEY HAVE COMPLETED ALL OF THE PIPE INSTALLATION.
08/18/2017 ENGINEERING - FINAL Not ready for Inspection CHECK ON THE CREW FIRST THING IN THE MORNING, THEY ARE STILL EXCAVATING DUE TO MORE RUSTY PIPE. THEY HAVE EXCAVATED APPROXIMATELY 40 OF PIPE AT THIS TIME AND STILL MAY HAVE TO GO BACK FARTHER ON THE ENDS DUE THE EXISTING RUST.
I CHECKED BACK IN WITH THE CREW AT THE END OF THE DAY, THEY ARE STILL WORKING ON THE PIPE REMOVAL AT THE WEST END AND HAVE STARTED THE NEW PIPE INSTALLATION AT THE EAST END OF THE PIPE RUN. THEY WILL START PLACING BACKFILL AROUND THE PIPES BY THE END OF TODAY AND WILL CONTINUE TOMORROW. I WILL CHECK BACK IN ON 8/21/2017 AND SEE HOW THE WORK WENT OVER THE WEEKEND.
08/17/2017 ENGINEERING - FINAL Not ready for Inspection MET THE CREW ON SITE THEY WILL BE REMOVING A DAMAGED SECTION OF DRAINAGE PIPE FROM UNDERNEATH THE ENDS OF TWO TRAILERS, THIS PIPE IS RUSTED AT THIS TIME. THE CREW WILL WORK ON THE EXCAVATING THE REMAINDER OF THE DAY.