Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2017 | PLUMBING - FINAL | Approved | ||
| 08/08/2017 | PLUMBING - FINAL | Denied | 1- SHALL PROVIDE THE REQUIRED TEST GAGE 15 LBS MAX 1/10 INCREMENTS. 2- SHALL PROVIDE AN AIR PRESSURE TEST ON 10 PSI. CHECK SYSTEM FOR LEAKS. |