Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2017 | PLUMBING - ROUGH, SOIL | Approved | ||
| 08/10/2017 | PLUMBING - ROUGH, SOIL | Denied | 1- SHALL PROVIDE A 10 FOOT OF HEAD WATER TEST ON THE SYSTEM. 2- SHALL PROVIDE CLEAN BACKFILL MATERIAL. NO ROCKS OR DEBRI ALLOWED. |