Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2017 | PLUMBING - ROUGH, SOIL | Approved | ||
| 08/21/2017 | PLUMBING - ROUGH, SOIL | Denied | 1- SHALL CONNECT CONNECT THE MASTER BATH LAVATORY WASTE LINE (P-1) HORIZONTALLY TO THE HORIZONTAL BRANCH LINE. REFERENCE SECTION P3108 2012 IPC. 2- RETEST THE SYSTEM |