Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/07/2019 |
ELECTRIC - INTERMEDIATE |
|
Approved |
|
| 01/23/2019 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
Installation of new switch gear #S3N-B05 (277-480), S1C-B02 (120-208); new transformer #TR1C-B0T. OK to energize equipment |
| 07/23/2018 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
TRANSFORMER AND MAIN BREAKER #S1N-BO5; BUSS DUCT #S1-BO5. OK TO ENERGIZE EQUIPMENT. |
| 05/08/2018 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
SWITCH GEAR #4 OF 5 AND #5 OF 5. ALL LINES TORQUED AS PER SPECIFICATIONS. OK TO ENERGIZE SYSTEM. |
| 12/19/2017 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
ELECTRIC VAULT PLACE IN SOUTH EAST CORNER OF BUILDING; CONDUIT LINES (4" @2, 5" @3) EAST AND WEST OF VAULT. OK TO PLACE CONCRETE. |