Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2017 | PLUMBING - FINAL | Approved | ||
| 08/01/2017 | PLUMBING - FINAL | Denied | 1- SHALL PROVIDE A WATER HEATER DRIP PAN AND CAP OFF THE DRAIN OUTLET AND EXTEND THE T & P DRAIN AND TERMINATE INTO THE PAN. 2- SHALL PROVIDE A GAS BOND IN WATER HEATER ROOM. 3- SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT ON THE WATER HEATER VENT CONNECTOR. 4- SHALL PROVIDE THE APPROVED PLANS AND PERMIT ON SITE AT THE TIME OF INSPECTION REQUEST. |