Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2018 | EXCAVATION/LAYOUT REBAR & ZON | Approved | WEST SIDE OF BUILDING A AND LOADING DOCK | |
| 04/17/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | WEST SIDE OF BUILDING A | |
| 04/03/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | LOADING DOCK WALLS LINES 1 AND 4, C TO E. | |
| 03/29/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | LOADING DOCK FOOTING. | |
| 03/27/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CONCRETE PANELS, BIULDINGS B & C, GRIDLINE A 1 THRU 11. | |
| 03/12/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 6 EACH TILT PANELS FOR BUILDINGS "B" AND BUILDING "C". THIS IS THE LAST OF THE TILT UP PANELS. OK TO PLACE CONCRETE. | |
| 03/07/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | BUILDING B & C, CONCRETE PANELS GRIDLINE B, 1 THRU 9. | |
| 03/05/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CONCRETE WALL PANELS GRIDLINE E, 12 THRU 22, GRIDLINE G, 22THRU 28 GRIDLINE 22, E THRU G |
|
| 02/26/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CONCRETE WALL PANELS GRID LINE G, 28 THRU 31 GRID LINE E, 6 THRU 12 |
|
| 02/21/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | 5 light pole footings, tilt panels 1-a5, 4-a15 1-a16 ok | |
| 02/13/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CONCRETE WALL PANELS PANELS ON LINE A, 4 THRU 15.5 |
|
| 02/09/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | CONCRETE WALL PANELS PANELS ON LINE 31, GRID LINE A THRU F PANELS ON LINE A, GRID 11.5 THRU 31 |
|
| 02/05/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | BUILDING B AND C ONLY | |
| 02/01/2018 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950 * |
|
| 01/22/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | SOUTH FOOTING LINE E, ROW 4-22 | |
| 01/19/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | ELEVATOR PIT WALLS | |
| 01/17/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | NORTHSIDE FOOTING WF-66 FOOTING MAT FOOTINGS #168 (2) |
|
| 01/12/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | STAIR FOOTINGS ON THE NORTHEAST SIDE, ELEVATOR FOOTING, CENTER MAT FOOTING AND SOUTHSIDE STARIWAY FOOTING | |
| 01/11/2018 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | FOOTING F24, 69, 78, 96, 120 |