Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2017 | MECHANICAL - INTERMEDIATE | Approved | elec, mech, - pass | |
| 07/21/2017 | MECHANICAL - INTERMEDIATE | Denied | 1- SHALL PROTECT THE PVC CONDENSATE DRAIN FROM UV. 2- SHALL SHALL LOCATE THE FLEX CONNECTOR AND GAS SHUT OFF VALVE AT UNIT. 3- SHALL PROVIDE ACCESS TO THE ROOF. |