Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2020 | ELECTRIC - FINAL | Approved | ALL DOCUMENTS HAVE BEEN TURNED IN AND APPROVED. THANK YOU! |
|
| 02/10/2020 | ELECTRIC - FINAL | Approved | ||
| 10/04/2019 | ELECTRIC - FINAL | Partial Approval | Clearance TEP DGC. Final inspection needed when ready. REOPENED FOR RE-INSPECTION |
|
| 06/05/2019 | ELECTRIC - FINAL | Partial Approval | ALL LEADS ARE LANDED AND THE SYSTEM HAS BEEN ENERGIZED BY TEP. | |
| 06/04/2018 | ELECTRIC - FINAL | Partial Approval | LANDED TO SWITCH GEAR AND GENERATOR | |
| 04/17/2018 | ELECTRIC - FINAL | Partial Approval | ||
| 02/27/2018 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1- VERIFIED THE NEW SES UNIT AND UFER CONDUCTOR HAS BEEN LANDED AT THE SWITCH GEAR. 2- ALL EXTERIOR CONDUITS THROUGH OUT THE SYSTEM IS OKAY. |