Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/11/2017 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
Incomplete inspection, 200 amp service installed without inspection, missing UFER, communication wires run in panel, service entrance conductors undersized, panel appears to be overloaded, provide load calcuations. Back fed 60 amp breaker not secured in place, PVC not permitted from meter socket to panel, have quaified electrician evalate this installation. |