Permit: T17CM04920

Parcel: 205946530

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T17CM04920

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
08/03/2017 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
08/02/2017 PLUMBING - ROUGH, SOIL Denied Backpitch and flat spot. Support trap arms. Closet bend out of slab!
Grey water is not installed as shown on plan.
Your City Approved plan detail clearly shows the Tub drain pipe to exit the building then turn back into the building before connecting to building drain. The plan also shows a Grey water Washer box piped to an exterior wall terminating above grade.
Your approved plan clearly shows a KItchen sink vent. Install as shown or provide documentation from your Engineer of record for this project for all changes.Backpitch at 1/8th bend. Support trap arms.
Grey water is not installed as shown on plan.
Your City Approved plan detail clearly shows the Tub drain pipe to exit the building then turn back into the building before connecting to building drain. The plan also shows a Grey water Washer box piped to an exterior wall terminating above grade.
Your approved plan clearly shows a KItchen sink vent. Install as shown or provide documentation from your Engineer of record for this project for all changes.Backpitch at 1/8th bend. Support trap arms.
Grey water is not installed as shown on plan.
Your City Approved plan detail clearly shows the Tub drain pipe to exit the building then turn back into the building before connecting to building drain. The plan also shows a Grey water Washer box piped to an exterior wall terminating above grade.
Your approved plan clearly shows a KItchen sink vent. Install as shown or provide documentation from your Engineer of record for this project for all changes.
08/01/2017 PLUMBING - ROUGH, SOIL Denied Piping installed below grade shall be continuously supported by compacted earth or sand or by supported sleeving. Isolate piping from rebar. Secure sleeving with rebar. Shade all pipe and tubing. Expose HCS connections.
Correct slope.
Note VTR or Island loop shown for KS.
Grey water is not installed as shown on plan.



*