Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2018 | PLUMBING - ROUGH, SOIL | Approved | Green #18 tracer wire up out of dirt at each end and run along pipe in ditch is required at buildin drain to short sewer line connection in yard. All coper to Galvanized connections to be brass fittings or nipples or dielectric fittings. |
|
| 07/26/2018 | PLUMBING - ROUGH, SOIL | Correction Required | Vent take offs to be above centerline of pipe or 45 degreesfrom level. Foam sleeve or wrap all water lines below grade with required/approved foam insulation. All 2" drain lines to have 1/4" per foot slope towards the building drain. All--Copper to Galvanized pipe connections shall be separated with a Brass nipple or approved dielectric fitting to prevent oxidation reduction (electrolisis/decomposition) of the pipes . There shold be a 10 foot high secured ABS pipe that fills the complete DWV system to pressure test the system for leaks. |
|
| 07/23/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection |