Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 08/01/2018 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection :* |
| 07/31/2018 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
Tape vertical rebar standoffs that penetrate the dirt and hold the horizontal footing rebar/steel in the forms. |
| 07/26/2018 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Correction Required |
Sleeve ABS DWV parallel through footing with a solid materioal that will not compromise poured footing strength. Termite spray required 24 hours before you pour the monolithic slab and footings. Tape rebar standoffs pounded into dirt to prevent rusting within the soil. Water pipe shall have clearance from horizontal footing rebar, cement and aggregate must have encapsulating and flow space to not create a void. |
| 07/23/2018 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
|