Inspection History Details
Inspection Status: Denied
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2017 | BUILDING - FINAL | Denied | 1- SHALL SEAL ALL TOP PLATE PENETRATIONS WITH FIRE RATED CAULK OR FOAM. 2- SHALL REPAIR ALL TEARS ON HVAC FLEX DUCTS. 3- SHALL SECURE THE 1ST FLOOR BATHROOM LIGHT BOX. |