Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/23/2019 |
PLUMBING - ROUGH, SOIL |
|
Approved |
|
| 01/10/2019 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
4" domestic water line from back flow preventer to building. Apparently 40', ok to cover progress area. |
| 08/15/2018 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
BUILDING #1 (RE-PLUMB FROM FIRE), WASTE AND VENT LINES AT 2" - 6" LINES THROUGHOUT. OK TO COVER PROGRESS AREAS. |
| 08/15/2018 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
24" STORM DRAIN LINE, FROM BUILDING #3 TO SIDEWALK AT BROADWAY BOULEVARD. OK TO COVER PROGRESS AREA. |
| 08/07/2018 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
24" RETENTION DRAIN LINE AT GL: Z/2-17. OK TO COVER PROGRESS AREA. |
| 08/03/2018 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
24" STORM DRAIN LINE AT GL: Z/2 - 9. OK TO COVER. |
| 06/01/2018 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
STORM WATER RETENTION LINES - 3 LINES AT 36", APPROXIMATELY 50' EACH. OK TO COVER APPROXIMATELY 50' AT WEST TO EAST. |
| 05/07/2018 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
24" STORM DRAIN (WEST) BETWEEN MAN HOLES #1 AND #2. OK TO COVER PROGRESS AREA. |
| 05/03/2018 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
CONTRACTOR CANCELLED. |