| 07/03/2019 | REINFORCED MASONRY PRE-GROUT | Approved | Masonry work is complete. | |
| 06/24/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Site wall at NE corner of building #2: approximately 150’, Ok to grout progress areas. | |
| 05/01/2019 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #1, site wall at 0”-32”: approximately 115 LF. Building #2, site wall at 0”-56”: approximately 125 LF. OK to place grout. | |
| 12/21/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage: East wall/ pool area - topped out. Pool area screen walls at 24”, ok to place grout, | |
| 12/20/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #1, Level #2: Rooms 1201-1208 | |
| 12/19/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Level #5; stair G-2 at level #5 to level #6. Ok to place grout. | |
| 12/12/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage: Elevator #2, Level 4 to 5 at 4' to 8'. Stair #G-2, Level 4 to 5, at 4' to 8'. Ok to grout progress areas. | |
| 12/11/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage: Elevator #2, atl level3 to level 4, 4' - 8'; stair G-2, level 3 to level 4. Ok to grout progress areas. | |
| 12/10/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Contractor cancelled | |
| 12/06/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage: Level #3, Elevator #3 at 4' - 8'; Stair #G-2 at Level #3 - 4; 4' - 8'. Ok to place grout. | |
| 12/04/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage, Elevator #3 at 4'-8', Level #2. Stair G-2 at 4'- 8': Level 2. Ok to place grout. | |
| 12/03/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage, Level #1, Eleva6#3: Levels 1 to 2; Stair #G-2 at Levels 1 to 2. Ok to place grout. | |
| 11/21/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #2 Trash Room at GL: 12/E-F. (topped out). Garage: South garage area: veneer column supports at GL: 1.5/N - Y, Electric room at Level #2 Garage at GL: 1.5 - 3/W. Ok to place grout. |
|
| 11/20/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Contractor cancelled | |
| 11/16/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage: Level #8 to top out. Elevator #3. | |
| 11/14/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage: Elevator #3, Level #8-9 at 2' - 8'. Elevator #3 at Level #5, topped out. Ok to place concrete. | |
| 11/08/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #2, Level #8, stair #2-1, topped out. Stair #2-1, Le els 6 & 7; West wall only. Garage: Elevator #3, Levels 7 & 8 at 0' - 4'. Ok to place grout in progress areas. | |
| 11/07/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage, stair #2-2, Level #4-5, Level #6-7 topped out. Elevator #3 at Level 6-7; Pool equipment room, topped out. Ok to place grout in progress areas. | |
| 11/02/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #2, stair #2-2 at levels #4-5. Ok to place grout. | |
| 11/02/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Pool equipment room Garage, Level #4 at 0'-6'; stair #2-2. Level #5 at 0'-6'. Ok to place grout. | |
| 11/01/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage, Elevator #3, Level #6 at 4' - 8,' | |
| 10/29/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage, Level #4; Stair 2 -2 at 0' - 4'. Level #5 at GL: N/16 - 17; Shear wall #22A - 11B. Ok to place grout. | |
| 10/26/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Contractor cancelled | |
| 10/24/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage: End line wall at level #4, GL: N/13 - 15. Building #2; Elevator #2 at Levels #5 - 8. at 4' - 8'. Stair #2 - 1 at Level #5; 4' - 8'. OK to grout progress areas. | |
| 10/23/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #1, Stair #1-1, topped out at 42'. Ok to place grout | |
| 10/22/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage: stair #3-1 (topped out); End line CMU wall at levels #4 - #5, GL: N,/2 - 15. OK to place grout. | |
| 10/19/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #1, Stair #1-1 at 30' - 36'. Ok to place grout | |
| 10/18/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #1, Stair #1-1 at 24' - 30'. Ok to grout progress areas | |
| 10/17/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #2. Elevator #2, topped out at roof. Garage: Level #4, East and West CMU walls at o 0' - 4' End line wall at Level #4, GL: Y/13-15; Ok to place grout |
|
| 10/17/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage Stair #3-1 at roof, 4' - 8' (double wall). Ok to grout | |
| 10/15/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Masonry Pre-grout: Partial. Building #1. Stair #1 at 18' - 24'. Ok to place grout. | |
| 10/12/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage: CMU wall at Level #3 at 4' - 8', GL: N/13 - 15; Stair #1-1 at 12' - 18. Ok to place grout | |
| 10/10/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #1, Stairwell/Elevator shaft at 6' - 12'. Garage: stairs G-1 at level #3 at 4' - 8'; stair #3-1 at Level #4; 8' - 12'. Ok to grout progress areas | |
| 10/08/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #1, Stair 1-1 at 0' to 6'; Garage; Level #3, Stair G-1 at 0' - 4'; CMU wall at GL:N/13 - 15 at 20' - 24' | |
| 10/05/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Garage Level #4, stair #3-1 at 4' - 8', Stair G-1, (Level #2) ar 4' - 8'; CMU wall at GL: N/15-16. OK to place grout. | |
| 10/02/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Contractor cancelled. | |
| 10/01/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #2, Stairs #2-1 Level #5 at 0' - 4'; Elevator #2, a level #5 at 0' - 4'; Garage, Stairs G-1, Level#2 at 0' - 4; End wall at GL: N/13-15 at 12' - 16'. Ok to place grout. |
|
| 09/28/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | Contractor cancelled. | |
| 09/27/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | Building #2, trash room columns at 4' to 10', stair #G-1, Level #2 at 0' to 4', Garage end line at GL: N,/13-15. OK to place grout | |
| 09/25/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | sTAIRWAY #G-1, LEVEL #1-2 AT 8 FEET, gl: n/9-15.5 TO LEVEL #2. OK TO GROUT PROGRESS AREAS. | |
| 09/24/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | INPECTION WAS PERFORMED ON 21 SEPTEMBER | |
| 09/21/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE; CMU WALLS AT GL: STAIRS G-1 IN BASEMENT AT 4' - 8'; IN LINE WALL AT N/13 - 15; LEVEL #1, GL: W-Y/1.5 - 3, LEVELS #1 AND #2. OK TO GROUT PROGRES AREAS. | |
| 09/19/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE AT LEVEL#6 AT GL: Y/5-15 (TOP OUT); STAIR WELL # 3-1 AT LEVELS #4-5; PLANTERS (2) AT LEVEL #5 AT GL: W-Y/12-14, OK TO PLACE GROUT, | |
| 09/14/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #2, LEVEL #2, ELEVATOR #2, STAIRWELL #2-1: 4' - 8'. GARAGE, STAIR WELL #G-1; BASEMENT AND LEVEL #1 AT 0' - 4'. OK TO GROUT PROGRESS AREAS. | |
| 09/13/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE/POOL DECK AT GL: Y/6-15 AT LEVEL #6, NOTCH AT GL: 15/W-Y. OK TO GROUT PROGRESS AREAS. | |
| 09/11/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #2. LEVEL #2, TRASH ROOM ,(TOPPED OUT). LEVEL #4. ELEVATOR #2 AT 0" - 48", GL: 7-8/E. LEVEL #4, STAIRWAY #3-1 AT 0" - 48": GL: 3-6/B. GARAGE WALL AT LEVEL #4, GL: 8-15/Y. OK TO GROUT PROGRESS AREAS. | |
| 09/06/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #1, STEM WALL AT 0"- 48", GARAGE LEVEL #4 CMU WALL AT 0" - 48". OK TO GROUT. | |
| 09/04/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #2, STAIRWELL #2-1; LEVELS 2 AND 3 AT 4' - 8'; TRASHROOM AT LEVEL #2 AT 4' - 8'; ELEVATOR #2, LEVELS 2 AND 3 AT 4' - 8'. OK TO GROUT PROGRESS AREAS. | |
| 08/29/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE: LEVELS #3 AND #4, CMU WALL AT 26' - 30' AT GL: Y/5-16: OK TO PLACE GROUT. | |
| 08/27/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #2, ELEVATOR #2, LEVELS #2 & #3 AT 0' - 4'; STAIR WELL #2-1; LEVELS #2 & #3 AT 0' - 4'. LEVEL #1 TRASHROOM AT 4' - 8'. OK TO PLACE GROUT. | |
| 08/24/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | CONTRACTOR CANCELLED. | |
| 08/23/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE . LEVEL #4, STAIRWELL #3-1 AT 24' - 32'. OK TO GROUT PROGRESS AREAS. | |
| 08/20/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE LEVEL #4 AT GL: Y/5 - 15.5, STAIRWELL 3.1 AT 20' - 24'. OK TO GROUT PROGRESS AREAS. | |
| 08/14/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE STAIRS (3.1) AT 16' - 20'; CMU DEMISING WALL AT GL: Y/6-16 AT 16' - 20'. | |
| 08/08/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE: LEVEL #4, GL: 1.5-2.5/Y AT 8' - 12'; STAIRWELL #3-1 AT 12' - 16'; GARAGE LEVEL #2, GL: Y/7-15.5. OK TO GROUT PROGRESS AREAS. | |
| 08/06/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | LEVEL #4, GARAGE GL: N/2-4; N/9-13 AT 8' - 12'. OK TO PLACE GROUT. | |
| 08/03/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CRASH WALL ON LEVEL #2, Y/8 - 15; LEVEL #4, DEMISING WALL AT Y/1.5 - 2.5. OK TO GROUT PROGRESS AREAS. | |
| 07/31/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE, LEVEL #1, GL: Y/8-15.5 (4' - 8'), BUILDING #2, LEVEL #1, STAIR #2-1 AT 4'- 8'; ELEVATOR #3 AT 4' - 8'4", TRASHROOM AT 4'-8'. OK TO GROUT PROGRESS AREAS. | |
| 07/27/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE: LEVEL #1, Y/1-2.5; Y/8-15. OK TO PLACE GROUT. | |
| 07/20/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #2, TRASH ROOM AT 0' - 4': GL: 7-9/B; STIRWELL #2-1, 0' - 4', GL: 3-6/B-B.5; ELEVATOR #2, 0' - 4', AT E/7-8; PARKING GARAGE: Y/1-2.5 AT 0'-4' AT LEVEL #4. OK TO GROUT PROGRESS AREAS. | |
| 07/19/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | CONTRACTOR CANCELLED. | |
| 07/16/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE: MAINTENANCE ROO: V-Y/1.5 - 3, AT 4' - 7'; LEVEL #1 AT GL: V - Y/1.5 - 5.3, LEVEL #1 ELEVATOR #3 AT 4' - 8': GL: 5/W.5. OK TO PLACE GROUT IN PROGRESS AREAS. | |
| 07/09/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | ELEVATOR #1 (BASEMENT) AT 4' - 8'; ELEVATOR #2 (BASEMENT) AT 4' - 7'4": LEVEL #1 FIRE PUMP ROOM AT 4' - 8'; STAIRWELL #2.2, LEVELS 2 - 3 AT 4' - 8'8". OK TO GROUT PROGRESS AREAS. | |
| 07/06/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BASEMENT: ELECTRICAL AND MAINTENANCE ROOMS AT 0' - 4'; ELEVATOR #3 AT 4' - 8' | |
| 06/14/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE: BASEMENT: ELEVATOR #1 AT 0" - 48", ELEVATOR #3 AT 0" - 48"; LEVEL #1, FIRE PUMP ROOM WALLS AT 0" - 48", EXTERIOR WALL AT GL: G/1 AT 0" - 48"; STAIRWELL #3-1 AT 8' - 12' (DOUBLE WALL); LEVEL #2; STAIRWELL #2-2 AT 0" - 48". OK TO PLACE GROUT. | |
| 06/13/2018 | REINFORCED MASONRY PRE-GROUT | Cancelled | CONTRACTOR CANCELLED. | |
| 06/12/2018 | REINFORCED MASONRY PRE-GROUT | Cancelled | ||
| 06/04/2018 | REINFORCED MASONRY PRE-GROUT | Cancelled | CONTRACTOR CANCELLED. | |
| 05/31/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE, STAIRWELL 2-2 AT 48" - 96" LEVEL 1; (SECOND LIFT), LIFT #2, STAIRWELL 2-2: LEVEL #2. | |
| 05/25/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GARAGE: LEVEL #1, STAIRWELL #2-2 AT 9' 4". BUILDING #1, STEM WALL AT NORTH SIDE AT 32". OK TO PLACE GROUT. | |
| 05/22/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU WALLS AT BUILDING #3, LEVEL #1 AT GLl Z/6-17 AT 32"; CMU WALL AT GL: 15-17/W-Z (32" - 40"). OK TO PLACE GROUT. | |
| 05/18/2018 | REINFORCED MASONRY PRE-GROUT | Cancelled | CONTRACTOR CANCELLED. | |
| 05/17/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU WALLS AT GL: LEVEL #1, N-O/7-9 (STAIRWELL #22), LOW VOLTAGE ROOM AT GL: W-Y/1.5-2.5. STAIRWELL G-1: N-O/15-17. OK TO PLACE GROUT. | |
| 05/15/2018 | REINFORCED MASONRY PRE-GROUT | Cancelled | CONTRACTOR CANCELLED. | |
| 05/14/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #2, STEM WALL AT 42" AFFE AT FL: 1 - 12/ F - N. OK TO PLACE GROUT. | |
| 05/10/2018 | REINFORCED MASONRY PRE-GROUT | Cancelled | CONTRACTOR CANCELLED | |
| 05/07/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | CONTRACTOR CANCELLED. | |
| 05/04/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU WALL AT GL: Y/1.5 - 3, (TOP-OUT). OK TO PLACE GROUT. | |
| 05/03/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | STEM WALL AT 0" - 48"; BLDG. #2, GL: 9-12/E.5-H.5 | |
| 05/02/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | TOPOUT CMU WALL BLD 2 GRIDLINE A-F / 1-12 (40") | |
| 04/30/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | STEM WALL AT 0" - 48" AT GL: A-B/14-17. OK TO PLACE GROUT. | |
| 04/27/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #1, CMU STEM WALL AT 0" - 48" AT GL: G-N/14-17. OK TO PLACE GROUT. | |
| 04/26/2018 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | CONTRACTOR CANCELLED. | |
| 04/25/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #1, STAIRWELL 1-1; CMU WALLS AT 38' - 42' (TOPPED OUT). OK TO GROUT PROGRESS AREA. | |
| 04/24/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #1, STAIRWELL #1-1: CMU WALLS AT 34' - 38' - OK TO PLACE GROUT | |
| 04/23/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | ||
| 04/23/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #1, STAIRWELL #1-1; CMU WALLS AT 28' - 32'. OK TO PLACE GROUT. | |
| 04/20/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | BUILDING #1, STAIRWELL #1-1: CMU WALLS AT 20' - 24': OK TO PLACE GROUT.. GARAGE: CMU WALL AT 16' - 24' AT GL: Y/1.5 - 3 (TOPPED OUT). OK TO PLACE GROUTL | |
| 04/19/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU WALLL AT 16' - 24' AT GL: W-Y/1.5 - 3. OK TO GROUT PROGRESS AREA. | |
| 04/18/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU WALL AT 4' - 12' AT GL: V/1.5-3. CMU WALLS AT STAIRWELL #1-1 AT 16' - 20'. OK TO GROUT PROGRESS AREAS. | |
| 04/17/2018 | REINFORCED MASONRY PRE-GROUT | Partial Approval | DOUBLE CMU MASONRY WALL AT GL: Y/1.5 - 3 AT 0" - 48". OK TO GROUT PROGRESS AREA. |