Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2017 | ELECTRIC - FINAL | Not ready for Inspection | call for final after all cross over completed | |
| 08/04/2017 | ELECTRIC - FINAL | Partial Approval | AP 7/12/17 CHANGE TO PA FOR TEP DRIVEN CHANGES | |
| 06/21/2017 | ELECTRIC - FINAL | Not ready for Inspection | EXPOSE WATER PIPE TO INSURE IT IS METAL OR ADD 2ND GROUND ROD. BOND GAS PIPE. INSTALL BONDING BUSHING ON LB. INSTALL PERMENANT ADDRESS, |