Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2017 | PLUMBING - GAS PRESSURE TEST | Approved | CLEAR GAS METER. | |
| 06/13/2017 | PLUMBING - GAS PRESSURE TEST | Denied | 1- GAS PRESSURE TEST IA AT ZERO PSI AT THE TIME OF INSPECTION. | |
| 06/12/2017 | PLUMBING - GAS PRESSURE TEST | Denied | 1- SHALL PROVIDE AN APPROVED PLAN AND PERMIT. 2- GAS PRESSURE TEST WAS AT ZERO PSI, CHECK THE SYSTEM FOR LEAKS. 3- SHALL BOND THE GAS LINE. 4- SHALL SECURE THE TRACER WIRE ON UNDERGROUND GAS LINE EVERY 8 FEET. 5- SHALL EXTEND THE FURNACE FLU VENT 3 FEET ABOVE THE COOLER. 6- SHALL PROVIDE AN CARBON MONOXCIDE DETECTOR. 7- SHALL PROVIDE A WATER HEATER DRIP PAN AND CAP THE DRAIN. |