Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2017 | PLUMBING - GAS PRESSURE TEST | Approved | CLEAR GAS METER | |
| 06/07/2017 | PLUMBING - GAS PRESSURE TEST | Denied | 1- SHALL SECURE ALL PIPING AS PER TABLE 415 (IFGC) 2012 2- GAS PIPING PLAN WAS APPROVED IN ERROR, SHALL RUN 1" PIPING ALL THE WAY TO THE FIRST BRANCH LINE TO THE FURNACE. 3- SHALL PROVIDE A BOND GROUND ON GAS LINE MINIMUM #6 CONDUCTOR. 4- SHALL HARD PIPE THE 1/2" GAS DROP TO THE WATER HEATER THRU THE WATER HEATER ENCLOSURE AND PROVIDE A SEDIMENT TRAP. 5- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR. 6- SHALL PROVIDE A FULL SIZE T & P DRAIN AT THE WATER HEATER. |