Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2017 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 10/23/2017 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | WORK NOT COMPLETE | |
| 08/31/2017 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | CANCELED | |
| 08/30/2017 | PLUMBING - GAS PRESSURE TEST | Denied | COMPLY WITH POREVIOUS BLOCK REGISTER BOOTS 3-SIDES NAIL PROTECT LINE SET SECURE ROMEX NEXT DENIAL WILL RESULT IN A REFEE |
|
| 08/25/2017 | PLUMBING - GAS PRESSURE TEST | Denied | MAKE UP ALL EXHAUST FANS NAIL PROTECT 3" AT KITCHEN BASE PLATE BLOCK REGISTER BOOTS 3 SIDES PANTRY SECURE 4 GANG BOXES NO TEST DWV CHICAGO LOOP KITCHEN SINK STOPPED INSPECTION 1ST FLOOR |
|
| 08/24/2017 | PLUMBING - GAS PRESSURE TEST | Denied | NO PLANS | |
| 08/21/2017 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | CANCELED |