Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/04/2018 |
ENGINEERING - FINAL |
|
Approved |
|
| 04/16/2018 |
ENGINEERING - FINAL |
|
Continued |
NO CHANGE TO PARKING AREA FROM LAST INSPECTION. |
| 02/22/2018 |
ENGINEERING - FINAL |
|
Continued |
PROVIDE ACCESSIBLE PATH FROM STREET AND IN TO BUILDING . PROVIDE ACCESSIBLE PARKING AND PATH TO BUILDING FROM PARKING. PROVIDE COT AP REVISIONS FOR CHANGES TO AP PLANS. |
| 02/21/2018 |
ENGINEERING - FINAL |
|
Continued |
MET WITH GC. |
| 02/20/2018 |
ENGINEERING - FINAL |
|
Continued |
MET WITH GC ON SITE WENT OVER ADA ACCESS. |
| 01/23/2018 |
ENGINEERING - FINAL |
|
Continued |
NO ACTIVITY OUT SIDE BUILDING. |
| 01/11/2018 |
ENGINEERING - FINAL |
|
Continued |
MET WITH GC ABOUT ADA PATH WAY IN TO BUILDING. |
| 12/21/2017 |
ENGINEERING - FINAL |
|
Continued |
BOND BEAMS IN SCREEN WALL OK. |
| 12/05/2017 |
ENGINEERING - FINAL |
|
Continued |
SCREEN WALL FOOTERS INSTALLED PER DETAIL ON PAGE SP-1.0. |
| 12/04/2017 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
PROVIDE A OVER ALL COT AP SITE PLAN FOR SITE ADDRESS 250 S TOOLE AV. |
| 12/01/2017 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
PROVIDE COT AP SITE PLANS FOR ACCESSIBLITY FROM ADA PARKING TO BUILDING AND FROM BUILDING TO STREET ALLOWING FOR THE 1 1/4 ''DIFFERENCE IN HEIGHT FROM BUILDING SLAB AND SIDE WALK. AND ROOF DRAINS CROSS OVER SIDE WALKS. |
| 11/30/2017 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
|