Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/17/2018 |
ELECTRIC - FINAL |
|
Approved |
|
| 09/06/2018 |
ELECTRIC - FINAL |
|
Correction Required |
Provide Licensed Electrical Contractor letter that the Service Panel, Subpanel are wired correctly and that all feeders and branch circuits throughout the house are sized and adequately protected with correct overcurrent protection. This includes the HVAC System installed on the roof. |
| 09/05/2018 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
Called ahead PJ Willkins, no access. 1 (520) 266-2092 |
| 08/23/2018 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
need power for final inspections may need a reconnect permit. |
| 07/31/2018 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
|
| 12/29/2017 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
|